Emptying

—— The Cultural Project As An Introduction To Guerrilla Architecture ——

HKU 22fall studio

Tutor: Charlotte Lafont-Hugo & Gilles Vanderstocken (Beau Architects)

Keywords: Context / Program / Materialisation


【00】Workshop

Collaborator: Long Xiao & Li Xuechang

Each group has to design and build a 1:1 element related to cultural space design. We chose the “HORIZONTAL” and the concept design is a “suspended” table with one pole.

After the party
【01】Context

EASTERN COMMERCIAL CENTRE BUILDING

Year built: 1975
Type: Office building
Area: 90840 sqft
Storet: 21
Lift: 3

Response to CONTEXT

use it

expose it

contrast it

The whole building is subdivided into 12 parts, and I chose the top 3 stories.
【02】Program
sketches of the possible dysfunctional plan
Response to PROGRAM

dysfunctional plan

to live in

and exhibit it

After visiting the site, I like the gaps between layers. I decided to maximize such character by creating layers.

a “floating” volume inside the existing skeleton.

Space in between layers can always be seen through. Both directions can see through even standing inside the core. The existing structure is exposed and clashed with the layers formed by continuous walls.

【03】Materialisation

Materialization is about intuition of the main concept(emptying) and observation of the context(layers). As for the existing structure, I try to use it, expose it, and contrast it. While,

Response to MATERIALISATION

contrast the raw concrete

unfinished walls

domestic living space

Sketches of perspectives with color code, imaging possible materials.

Tectonic is important when applying materials. I pretend to consider the possible ways of constructing my project and draw the details in sections, showing the relations between the addition part and the existing structure.